한국도선사협회에 오신것을 환영합니다. > Passage Plan 페이지


Area Pier Passage plan(view) Download
Inbound Outbound
NORTH HARBOR KEPCO DOLPHIN NO.01 NO.02 NORTH
SK OIL INCHEON CLX DOLPHIN
KOREA AIR LINE CO. DOLPHIN
DONGBU TERMINAL
DONGKUK/HYUNDAI STEEL
MOKJAE/KOREA/SUNKWANG TERMINAL
INNER HARBOR THE 1ST PIER NO.03 NO.04 INNER
THE 2ND PIER
THE 3RD PIER
THE 4TH PIER
THE 5TH PIER
THE 6TH PIER
THE 7TH PIER
THE 8TH PIER
SOUTH HARBOR ICT/E1CT/SICT/KET(CONTAINER TERMINALS) NO.05 NO.06 SOUTH
HANIL TANK DOLPHIN
SSANGYONG CEMENT INDUSTRIL CO. DOLPHIN
TONG YANG CEMENT CORP. DOLPHIN
HANIL DAEWOO CEMENT SOLPHIN
YOUNGJIN TERMINAL
COASTAL HARBOR INTERNATIONAL FERRY TERMINAL NO.07 NO.08 COASTAL
DOMESTIC FERRY TERMINAL
THE 3RD PIER
SK CORP. DOLPHIN
COAL WHARF
LNG/E1GT PIER LNG/E1GT PIER NO.09 NO.10 LPG PIER
KYEONG IN PORT No.2 PS to KYEONG IN PORT NO.11 NO.12 KYEONG IN
YHD No.2 PS to YHD(YEONGHEUNG THERMAL POWER PLANT) NO.13 YHD
YHD to No.4 PS NO.14
NEW PORT No.2 PS to NEW PORT NO.15 NEW PORT
NEW PORT TO No.4 PS NO.16

IMPORTANT NOTICE

  • INCHEON Pilot office info. : Tel. +82 32 883 8111~4, www.incheonpilot.com, incpilot@kmpilot.or.kr
  • The Breakwater is under construction for new harbour, which is shown in dotted line on the chart extending to 36˚-05.3'N / 129˚-28.4'E, of which direction is 315˚
  • A fixed fishing net which consists of thick wires exists near 36˚-04.5'N / 129˚-31.0'E
  • Every vessel approaching or leaving Pohang shall have due regard to above obstructions and avoid them by as wide a margin as is practicable.
  • This pilotage passage plan will provide the information for helping safe pilotage by pilotage area to secure safe entry into or departure from ports as per Korean pilotage act Article 25. Please be noted that actual condition to differ from the plan.